Forms-FAA 7460-1 Construction Crane

The Federal Aviation Administration (FAA) requires a permit on construction cranes any time that they will exceed a 100:1 sloped surface from the nearest point of the nearest runway out to 20,000 feet or 200 feet AGL (above ground level) beyond.

The FAA requires that Form 7460-1 be submitted at least 30 days before or more either before the date the proposed construction is to begin, or the date an application for a construction permit is to be filed.

For further information and to file the form click on the following link:

https://oeaaa.faa.gov/oeaaa/external/portal.jsp

Also please check with Federal, State and Local Governments for any forms or permits that are also required. For more information please contact the FAA or refer to Federal Aviation Regulations Part 77.